Key Steps and Precautions for the Acceptance of HDPE Geocell Materials
Acceptance of HDPE geocell materials is a crucial step in ensuring project quality. Its basic steps can be divided into three stages: preliminary preparation, on-site acceptance, and post-processing.
November 11, 2025
What Methods Can Extend the Service Life of Geocells?
In the field of mitigating geological hazards, there are quite strict standards for the quality and service life of geocells, and common methods to extend the service life of geocells.
November 07, 2025
Geocell River Protection Project Selection Guide: Precise Control of Core Parameters
Geocells play a crucial role in dike protection, serving an irreplaceable function in preventing landslides and ensuring foundation stability.
November 04, 2025
The Ultimate Guide to Selecting Triaxial Plastic Geogrids for Subgrade Construction
Triaxial plastic geogrid is a new product developed and improved based on uniaxial and biaxial plastic geogrids.
October 31, 2025
Study on the influence of geocell welding process parameters on structural bearing capacity
Geocell welding process parameters directly determine the quality of the welding points, which in turn have a decisive impact on the bearing capacity, deformation resistance and long-term durability of the overall structure.
October 24, 2025
Brief analysis of the construction steps and related issues of parking space grass grid
The specific steps of parking space grass grid construction can be divided into five stages: "pre-construction preparation, foundation layer construction, grass grid laying, filling and grass planting, and post-maintenance."
October 21, 2025
Analysis of the construction plan for the roof planting system of the community underground garage
The basement top plate planting system includes: vegetation layer, soil layer, geotextile, geonet, drainage board, protective layer, SBS waterproof membrane and structural layer.
October 17, 2025
Standard steps for the construction of geotextile bag slope protection projects, detailed on-site tutorials
Based on the example project, we will explain the standardized process of eco-bag construction, the precautions during the construction process, and the specific matters of acceptance work after the construction is completed.
October 14, 2025
Aging mechanism of geogrid and methods to slow down its aging rate
Geogrid aging refers to the process by which, over long-term use, the physical and chemical properties of geogrids gradually deteriorate due to environmental factors, ultimately leading to material failure.
October 07, 2025
Analysis of key factors affecting geomembrane performance
The key factors affecting the performance of geomembranes can be disassembled from five dimensions: raw material source, production process, construction application, environmental impact, and post-maintenance
October 03, 2025
Analysis of the Anti-Erosion Mechanism of Three-Dimensional Honeycomb Constraint System in Slope Protection
The so-called three-dimensional honeycomb restraint system is a common geocell. It is a three-dimensional honeycomb grid structure made of high-molecular polymers (such as HDPE and PP) through a special process.
September 30, 2025
PREVIOUS 1 2

Contact

Address
No. 6 Great Wall Road, Taian City, Shandong, China
EMail
admin@lianxiangcn.com
Hotline
+86-185 5418 0188
Shandong Lianxiang Engineering Materials Co., Ltd. All Right Reserved